Development History

2015
Direction determined in 2015, global industry research and technological pre-research from 2015-2017

2018
Team established in 2018 to initiate cutting-edge forward design, including simulation and modeling, related to aero-rotary engines.

2019
Completed the conceptual design of the prototype in 2019

2020
In December 2020, the prototype engineering design was completed

2021
Detailed design of the first-generation rotor engine prototype completed in May 2021; ignition test of the first-generation prototype in November.

2022
In May 2022, the second-generation prototype was manufactured and ignition testing was conducted.

2023
April: Trial production and testing of the 3rd to 5th generation prototypes; August: Contract signing in Changzhou

2024
From January to April, the fifth-generation engineering prototype was tested and finalized; In November, it participated in the Zhuhai Airshow, making its global debut.

2025
In March, small-batch project consistency was completed, and the project entered the small-batch production and system integration phase.